Results gallery
Every result, with a timeframe.
Filter by industry, outcome, or module. Each row links back to the full case study so you can see the caveats and the conditions.
Nordic Water UtilityOpen →
−9%
kWh / m³
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- 9 months rolling
Nordic Water UtilityOpen →
0
permit exceedances
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Same period
Nordic Water UtilityOpen →
12 weeks
to first signal
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Pilot to recommendation
Nordic Water UtilityOpen →
2.4 yrs
estimated payback
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Plant-wide rollout
| Customer | Industry | Outcome | Result | Timeframe | |
|---|---|---|---|---|---|
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | −9% kWh / m³ | 9 months rolling | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 0 permit exceedances | Same period | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 12 weeks to first signal | Pilot to recommendation | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 2.4 yrs estimated payback | Plant-wide rollout | Open → |
Results reflect the audited unit and time window in each case study. See the linked story for caveats and operating conditions.