Results gallery
Every result, with a timeframe.
Filter by industry, outcome, or module. Each row links back to the full case study so you can see the caveats and the conditions.
Specialty Chemicals Co.Open →
−71%
false alarms
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- 3 months
Specialty Chemicals Co.Open →
< 7 min
MTTD on real upsets
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Same period
Specialty Chemicals Co.Open →
+18
Net Promoter from operators
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Internal survey
Specialty Chemicals Co.Open →
6 weeks
pilot length
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Single unit
Midstream OperatorOpen →
+12%
uptime
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- 12 months
Midstream OperatorOpen →
+41%
MTBF
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Same period
Midstream OperatorOpen →
3
early-catch events
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Same period
Midstream OperatorOpen →
8 weeks
to first early catch
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Pilot
| Customer | Industry | Outcome | Result | Timeframe | |
|---|---|---|---|---|---|
| Specialty Chemicals Co. | Chemicals | Detect anomalies | −71% false alarms | 3 months | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | < 7 min MTTD on real upsets | Same period | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | +18 Net Promoter from operators | Internal survey | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | 6 weeks pilot length | Single unit | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | +12% uptime | 12 months | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | +41% MTBF | Same period | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | 3 early-catch events | Same period | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | 8 weeks to first early catch | Pilot | Open → |
Results reflect the audited unit and time window in each case study. See the linked story for caveats and operating conditions.