Results gallery
Every result, with a timeframe.
Filter by industry, outcome, or module. Each row links back to the full case study so you can see the caveats and the conditions.
Nordic Water UtilityOpen →
−9%
kWh / m³
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- 9 months rolling
Nordic Water UtilityOpen →
0
permit exceedances
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Same period
Nordic Water UtilityOpen →
12 weeks
to first signal
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Pilot to recommendation
Nordic Water UtilityOpen →
2.4 yrs
estimated payback
- Industry
- Water & wastewater
- Outcome
- Reduce energy & emissions
- Timeframe
- Plant-wide rollout
Nordic FoodsOpen →
+2.1pp
first-pass yield
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- 6 months
Nordic FoodsOpen →
−38%
off-spec rework
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Same period
Nordic FoodsOpen →
8 weeks
pilot to production
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Single line
Nordic FoodsOpen →
4
operators trained
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Before go-live
Returkraft EnergyOpen →
−3.1%
heat rate
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- 12 months
Returkraft EnergyOpen →
0
advisor-attributable trips
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
+1.9%
net MWh output
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
14 weeks
pilot length
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Single unit
Northern MetalsOpen →
+4.8%
tonnes / hour
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- 6 months
Northern MetalsOpen →
−22%
control swings
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Same period
Northern MetalsOpen →
Neutral
liner wear
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Inspection cycle
Northern MetalsOpen →
10 weeks
to first recommendation
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Pilot
Midstream OperatorOpen →
+12%
uptime
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- 12 months
Midstream OperatorOpen →
+41%
MTBF
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Same period
Midstream OperatorOpen →
3
early-catch events
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Same period
Midstream OperatorOpen →
8 weeks
to first early catch
- Industry
- Oil & gas
- Outcome
- Reduce downtime
- Timeframe
- Pilot
| Customer | Industry | Outcome | Result | Timeframe | |
|---|---|---|---|---|---|
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | −9% kWh / m³ | 9 months rolling | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 0 permit exceedances | Same period | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 12 weeks to first signal | Pilot to recommendation | Open → |
| Nordic Water Utility | Water & wastewater | Reduce energy & emissions | 2.4 yrs estimated payback | Plant-wide rollout | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | +2.1pp first-pass yield | 6 months | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | −38% off-spec rework | Same period | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | 8 weeks pilot to production | Single line | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | 4 operators trained | Before go-live | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | −3.1% heat rate | 12 months | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 0 advisor-attributable trips | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | +1.9% net MWh output | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 14 weeks pilot length | Single unit | Open → |
| Northern Metals | Metals & mining | Optimize throughput | +4.8% tonnes / hour | 6 months | Open → |
| Northern Metals | Metals & mining | Optimize throughput | −22% control swings | Same period | Open → |
| Northern Metals | Metals & mining | Optimize throughput | Neutral liner wear | Inspection cycle | Open → |
| Northern Metals | Metals & mining | Optimize throughput | 10 weeks to first recommendation | Pilot | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | +12% uptime | 12 months | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | +41% MTBF | Same period | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | 3 early-catch events | Same period | Open → |
| Midstream Operator | Oil & gas | Reduce downtime | 8 weeks to first early catch | Pilot | Open → |
Results reflect the audited unit and time window in each case study. See the linked story for caveats and operating conditions.