Results gallery
Every result, with a timeframe.
Filter by industry, outcome, or module. Each row links back to the full case study so you can see the caveats and the conditions.
Returkraft EnergyOpen →
−3.1%
heat rate
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- 12 months
Returkraft EnergyOpen →
0
advisor-attributable trips
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
+1.9%
net MWh output
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
14 weeks
pilot length
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Single unit
Northern MetalsOpen →
+4.8%
tonnes / hour
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- 6 months
Northern MetalsOpen →
−22%
control swings
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Same period
Northern MetalsOpen →
Neutral
liner wear
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Inspection cycle
Northern MetalsOpen →
10 weeks
to first recommendation
- Industry
- Metals & mining
- Outcome
- Optimize throughput
- Timeframe
- Pilot
| Customer | Industry | Outcome | Result | Timeframe | |
|---|---|---|---|---|---|
| Returkraft Energy | Power & energy | Optimize throughput | −3.1% heat rate | 12 months | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 0 advisor-attributable trips | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | +1.9% net MWh output | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 14 weeks pilot length | Single unit | Open → |
| Northern Metals | Metals & mining | Optimize throughput | +4.8% tonnes / hour | 6 months | Open → |
| Northern Metals | Metals & mining | Optimize throughput | −22% control swings | Same period | Open → |
| Northern Metals | Metals & mining | Optimize throughput | Neutral liner wear | Inspection cycle | Open → |
| Northern Metals | Metals & mining | Optimize throughput | 10 weeks to first recommendation | Pilot | Open → |
Results reflect the audited unit and time window in each case study. See the linked story for caveats and operating conditions.