Results gallery
Every result, with a timeframe.
Filter by industry, outcome, or module. Each row links back to the full case study so you can see the caveats and the conditions.
Nordic FoodsOpen →
+2.1pp
first-pass yield
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- 6 months
Nordic FoodsOpen →
−38%
off-spec rework
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Same period
Nordic FoodsOpen →
8 weeks
pilot to production
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Single line
Nordic FoodsOpen →
4
operators trained
- Industry
- Food & beverage
- Outcome
- Improve quality & yield
- Timeframe
- Before go-live
Returkraft EnergyOpen →
−3.1%
heat rate
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- 12 months
Returkraft EnergyOpen →
0
advisor-attributable trips
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
+1.9%
net MWh output
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Same period
Returkraft EnergyOpen →
14 weeks
pilot length
- Industry
- Power & energy
- Outcome
- Optimize throughput
- Timeframe
- Single unit
Specialty Chemicals Co.Open →
−71%
false alarms
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- 3 months
Specialty Chemicals Co.Open →
< 7 min
MTTD on real upsets
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Same period
Specialty Chemicals Co.Open →
+18
Net Promoter from operators
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Internal survey
Specialty Chemicals Co.Open →
6 weeks
pilot length
- Industry
- Chemicals
- Outcome
- Detect anomalies
- Timeframe
- Single unit
| Customer | Industry | Outcome | Result | Timeframe | |
|---|---|---|---|---|---|
| Nordic Foods | Food & beverage | Improve quality & yield | +2.1pp first-pass yield | 6 months | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | −38% off-spec rework | Same period | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | 8 weeks pilot to production | Single line | Open → |
| Nordic Foods | Food & beverage | Improve quality & yield | 4 operators trained | Before go-live | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | −3.1% heat rate | 12 months | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 0 advisor-attributable trips | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | +1.9% net MWh output | Same period | Open → |
| Returkraft Energy | Power & energy | Optimize throughput | 14 weeks pilot length | Single unit | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | −71% false alarms | 3 months | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | < 7 min MTTD on real upsets | Same period | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | +18 Net Promoter from operators | Internal survey | Open → |
| Specialty Chemicals Co. | Chemicals | Detect anomalies | 6 weeks pilot length | Single unit | Open → |
Results reflect the audited unit and time window in each case study. See the linked story for caveats and operating conditions.